Seavey Builders, Inc. |
|||||||||
| MASTER BATHROOM | |||||||||
| [ HOME ] | |||||||||
|
|||||||||
Week ending 08/03/2007 The entire layout of the master bath has been redesigned to meet the needs of the homeowners. The whirlpool will be replaced with a walk-in ceramic shower. Elimination of the whirlpool with a walk -in shower allows room for a new closet. This picture shows entire demolition of the master bath and new framing of closet. |
|||||||||
|
|||||||||
© Copyright 2007, Seavey Builders, Inc., all rights reserved Lic.# 20350976 |
|||||||||